CONTROL TUNNEL OF THE ETSCHWERKE AEW BOZEN

The task at first was a simple seal. But since it was hollow under the first layer of concrete, part had to be pried away. Beneath it appeared blackened soil.
 
The task then changed. First, the hole was opened to a depth of approx. 40 cm, followed by setting connecting irons, inserting hoses for later foam filling and pouring over the affected piece. A sealing cord was laid to guarantee absolute watertightness.
 
The following IPA products were used in this unusual project:
 
IPAPUR VM 1K and IPAPUR VM 2K

IPANEX packing mortar

IPA battery injection press.