BASIN REMEDIATION TREATMENT PLANT CALBE

The clarifying basin in Calbe, which was in need of rehabilitation, was reprofiled with IPA Unimörtel Rapid in the first step.
 
Then the entire pool was mechanically coated with IPA poly layer. The total size of the pool is about 500 m².

Other Projects

Control gallery in Bolzano

Learn more

Sewage treatment plant in Ustka

Learn more

Refurbishment of the catch basin

Learn more

RBB in Birkenwerder

Learn more